Is it possible to display the task bars with a gradient color
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/31/2009# .LevelCount = 2 .PaneWidth(False) = 96 .Bars.Copy "Task","TaskO" With .Bars.Item("Task") .Pattern = 99 ' PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox Or PatternEnum.exPatternShadow .StartColor = RGB(255,255,255) .EndColor = .Color End With End With .Columns.Add "Types" With .Items .AddBar .AddItem("Original"),"TaskO",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Pattern Gradient"),"Task",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Original"),"TaskO",#1/4/2010#,#1/9/2010#,"" End With .EndUpdate End With |
1199 |
How can I know the type of bars I can displays using predefined patterns
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/31/2009# .LevelCount = 2 .PaneWidth(False) = 96 With .Bars .Add("Box").Pattern = 32 .Add("ThickBox").Pattern = 4128 ' PatternEnum.exPatternThickBox Or PatternEnum.exPatternBox .Add("DiagBox").Pattern = 4102 ' PatternEnum.exPatternThickBox Or PatternEnum.exPatternBDiagonal .Copy("Task","Shadow").Pattern = 8195 ' PatternEnum.exPatternFrameShadow Or PatternEnum.exPatternShadow .Copy("Task","TShadow").Pattern = 12295 ' PatternEnum.exPatternFrameShadow Or PatternEnum.exPatternThickBox Or PatternEnum.exPatternDiagCross With .Add("HGrad1") .Pattern = 32 .StartColor = RGB(255,255,255) .EndColor = RGB(0,0,255) End With With .Add("HGrad2") .Pattern = 35 ' PatternEnum.exPatternBox Or PatternEnum.exPatternShadow .StartColor = RGB(255,255,255) .EndColor = RGB(0,0,255) .Color = RGB(0,0,255) End With With .Add("HGrad3") .Pattern = 163 ' PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternBox Or PatternEnum.exPatternShadow .StartColor = RGB(255,255,255) .EndColor = .StartColor .Color = RGB(0,0,255) End With With .Add("HGrad4") .Pattern = 4256 ' PatternEnum.exPatternThickBox Or PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternBox .StartColor = RGB(255,255,255) .EndColor = .StartColor .Color = RGB(0,0,255) End With With .Add("HGrad5") .Pattern = 8352 ' PatternEnum.exPatternFrameShadow Or PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternBox .StartColor = RGB(0,255,0) .EndColor = RGB(255,0,0) .Color = RGB(0,0,255) End With With .Add("VGrad1") .Pattern = 96 ' PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox .StartColor = RGB(255,255,255) .EndColor = RGB(0,0,255) .Height = 14 End With With .Add("VGrad2") .Pattern = 99 ' PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox Or PatternEnum.exPatternShadow .StartColor = RGB(255,255,255) .EndColor = RGB(0,0,255) .Color = RGB(0,0,255) .Height = 14 End With With .Add("VGrad3") .Pattern = 227 ' PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox Or PatternEnum.exPatternShadow .StartColor = RGB(255,255,255) .EndColor = .StartColor .Color = RGB(0,0,255) .Height = 14 End With With .Add("VGrad4") .Pattern = 4320 ' PatternEnum.exPatternThickBox Or PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox .StartColor = RGB(255,255,255) .EndColor = .StartColor .Color = RGB(0,0,255) .Height = -1 End With With .Add("VGrad5") .Pattern = 8416 ' PatternEnum.exPatternFrameShadow Or PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox .StartColor = RGB(0,255,0) .EndColor = RGB(255,0,0) .Color = RGB(0,0,255) .Height = 14 End With End With End With .Columns.Add "Types" With .Items .AddBar .AddItem("Box"),"Box",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Thick Box"),"ThickBox",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Thick Box Diag"),"DiagBox",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Shadow"),"Shadow",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Thick Shadow"),"TShadow",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Solid Gradient"),"HGrad1",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Pattern Gradient"),"HGrad2",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Pattern Gradient 3 Colors"),"HGrad3",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Solid Gradient 3 Colors"),"HGrad4",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Gradient Shadow"),"HGrad5",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Solid Gradient"),"VGrad1",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Pattern Gradient"),"VGrad2",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Pattern Gradient 3 Colors"),"VGrad3",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Solid Gradient 3 Colors"),"VGrad4",#1/4/2010#,#1/9/2010#,"" .AddBar .AddItem("Gradient Shadow"),"VGrad5",#1/4/2010#,#1/9/2010#,"" End With .EndUpdate End With |
1198 |
Is it possible to display the bars with a thicker border
With G2antt1 .BeginUpdate .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.PaneWidth(False) = 48 .Chart.Bars.Copy("Task","TaskB").Pattern = 4099 ' PatternEnum.exPatternThickBox Or PatternEnum.exPatternShadow With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 2"),"TaskB",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 3"),"Task",#1/2/2001#,#1/5/2001#,"" End With .EndUpdate End With |
1197 |
Is it possible to display the shadow for EBN bars
With G2antt1 .BeginUpdate .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.PaneWidth(False) = 48 With .Chart.Bars.Copy("Task","EBN") .Color = &H1000000 .Pattern = 8192 End With .Chart.Bars.Copy("Task","EBN2").Color = &H1000000 With .Items .AddBar .AddItem("Task 1"),"EBN2",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 2"),"EBN",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 3"),"EBN2",#1/2/2001#,#1/5/2001#,"" End With .EndUpdate End With |
1196 |
Can I display a shadow for my bars
With G2antt1 .BeginUpdate .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.PaneWidth(False) = 48 .Chart.Bars.Item("Task").Pattern = 8195 ' PatternEnum.exPatternFrameShadow Or PatternEnum.exPatternShadow With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 2"),"Task",#1/2/2001#,#1/5/2001#,"" End With .EndUpdate End With |
1195 |
How can I use the Color property for gradient bars
With G2antt1 .BeginUpdate .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.PaneWidth(False) = 48 With .Chart.Bars.Add("V") .Color = RGB(255,0,0) .StartColor = RGB(0,255,0) .EndColor = .StartColor .Pattern = 224 ' PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox .Height = -1 End With With .Chart.Bars.Add("H") .Color = RGB(255,0,0) .StartColor = RGB(0,255,0) .EndColor = .StartColor .Pattern = 160 ' PatternEnum.exPatternGradient3Colors Or PatternEnum.exPatternBox End With With .Items .AddBar .AddItem("Task 1"),"V",#1/2/2001#,#1/5/2001#,"" .AddBar .AddItem("Task 2"),"H",#1/2/2001#,#1/5/2001#,"" End With .EndUpdate End With |
1194 |
Is there any option to show bars with vertical gradient
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# With .Chart.Bars.Item("Task") .Color = RGB(255,0,0) .StartColor = RGB(0,255,0) .EndColor = RGB(255,255,0) .Pattern = 96 ' PatternEnum.exPatternGradientVBox Or PatternEnum.exPatternBox End With With .Items h = .AddItem("Task") .AddBar h,"Task",#1/2/2001#,#1/5/2001#,"" End With End With |
1193 |
How can I define a new milestone bar
With G2antt1 .BeginUpdate .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .Chart.FirstVisibleDate = #1/1/2001# With .Chart.Bars .AddShapeCorner 12345,1 .AddShapeCorner 12346,2 .Copy("Milestone","M1").StartShape = 12345 ' &H3020 Or ShapeCornerEnum.exShapeIconVBar Or ShapeCornerEnum.exShapeIconRight .Copy("Milestone","M2").StartShape = 12346 ' &H3020 Or ShapeCornerEnum.exShapeIconSquare Or ShapeCornerEnum.exShapeIconRight With .Copy("Milestone","MP") .StartShape = 20 .StartColor = RGB(255,0,0) End With End With .Columns.Add "Column" With .Items .AddBar .AddItem("Default"),"Milestone",#1/2/2001#,#1/2/2001# .AddBar .AddItem("Predefined"),"MP",#1/3/2001#,#1/3/2001# .AddBar .AddItem("Custom 1"),"M1",#1/4/2001#,#1/4/2001# .AddBar .AddItem("Custom 2"),"M2",#1/5/2001#,#1/5/2001# End With .EndUpdate End With |
1192 |
How can I define my milestone bar, using my icons or pictures
With G2antt1 .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" .Chart.FirstVisibleDate = #1/1/2001# With .Chart.Bars .AddShapeCorner 12345,1 .Item("Milestone").StartShape = 12345 ' &H3020 Or ShapeCornerEnum.exShapeIconVBar Or ShapeCornerEnum.exShapeIconRight End With .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Milestone",#1/2/2001#,#1/2/2001# End With End With |
1191 |
Is it possible to specify manually non-working days instead using the NonworkingDays as being repetitive
With G2antt1 .BeginUpdate With .Chart .DrawGridLines = -1 .FirstVisibleDate = #1/1/2010# .PaneWidth(0) = 0 .LevelCount = 2 .Level(0).DrawGridLines = True .ShowNonworkingUnits = False .ShowNonworkingDates = False .NonworkingDays = 0 .AddNonworkingDate #1/10/2010# .AddNonworkingDate #1/11/2010# .AddNonworkingDate #1/15/2010# .AddNonworkingDate #1/16/2010# End With .EndUpdate End With |
1190 |
Is it possible to hide specific days
With G2antt1 .BeginUpdate With .Chart .DrawGridLines = -1 .FirstVisibleDate = #1/1/2010# .PaneWidth(0) = 0 .LevelCount = 2 .Level(0).DrawGridLines = True .ShowNonworkingUnits = False .ShowNonworkingDates = False .NonworkingDays = 128 .AddNonworkingDate #1/10/2010# .AddNonworkingDate #1/11/2010# .AddNonworkingDate #1/15/2010# .AddNonworkingDate #1/16/2010# End With .EndUpdate End With |
1189 |
Is it possible to show or display the marked zones ONLY in the overview part of the control
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .FirstVisibleDate = #1/14/2001# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .OverviewVisible = 2 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/3/2001#,#1/4/2001#,.BackColor,";;Zone <b>1</b>" .MarkTimeZone "Z2",#2/6/2001#,#2/7/2001#,.BackColor,";;Zone <b>2</b>" .MarkTimeZone "Z3",#1/16/2001#,#1/19/2001#,.BackColor,";;Zone <b>3</b>" .OverviewShowMarkTimeZones = True .OverviewBackColor = RGB(220,240,240) End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/5/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#2/5/2001#,#2/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1188 |
Is it possible to show or display the marked zones in the overview part of the control
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .FirstVisibleDate = #1/14/2001# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .OverviewVisible = 2 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/3/2001#,#1/4/2001#,16777056 .MarkTimeZone "Z2",#2/6/2001#,#2/7/2001#,16744544 .MarkTimeZone "Z3",#1/16/2001#,#1/19/2001#,16744544 .OverviewShowMarkTimeZones = True End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/5/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#2/5/2001#,#2/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1187 |
Is there a quick way to determine if a bar belongs to a group
With G2antt1 .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 64 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" h3 = .AddItem("Task 3") .AddBar h3,"Task",#1/5/2001#,#1/7/2001#,"K3" .GroupBars h1,"K1",True,h2,"K2",True .GroupBars h1,"K1",False,h2,"K2",False .GroupBars h1,"K1",True,h3,"K3",True .GroupBars h1,"K1",False,h3,"K3",False Debug.Print( .ItemBar(h1,"K1",522) ) End With End With |
1186 |
I am using the ScrollRange property to limit the chart's visible area, but it does not work as expected. What could be wrong
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .PaneWidth(0) = 56 .ScrollRange(0) = #1/1/100# .ScrollRange(1) = #12/31/9999# .FirstVisibleDate = #4/28/2010# End With .ScrollPartCaption(2,512) = .Chart.ScrollRange(0) .ScrollPartCaptionAlignment(2,512) = 0 .ScrollPartCaption(2,128) = .Chart.ScrollRange(1) .ScrollPartCaptionAlignment(2,128) = 2 .EndUpdate End With |
1185 |
Are you planning to add a AddNonworkingDate / AddNonworkingDay for separate items
With G2antt1 .BeginUpdate .AllowChartScrollPage = True .Columns.Add "Non-Work" With .Chart .FirstVisibleDate = #4/4/2009# .PaneWidth(False) = 52 .LevelCount = 2 End With With .Items .AddItem "Default" .ItemNonworkingUnits(.AddItem("Test 1"),False) = "shortdate(value) in (#4/5/2009#,#4/6/2009#)" .ItemNonworkingUnits(.AddItem("Test 2"),False) = "shortdate(value) in (#4/6/2009#,#4/7/2009#)" .ItemNonworkingUnits(.AddItem("Test 3"),False) = "shortdate(value) in (#4/7/2009#,#4/9/2009#)" .AddItem "Default" End With .EndUpdate End With |
1184 |
How can I enlarge the EBN being applied to an object
With G2antt1 .BeginUpdate .DefaultItemHeight = 32 With .VisualAppearance .Add 2,"c:\exontrol\images\normal.ebn" .Add 1,"CP:2 -3 -2 3 2" End With With .Chart .FirstVisibleDate = #1/1/2002# .SelBarColor = &H1000000 .PaneWidth(0) = 48 End With .Columns.Add "Task" With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2002#,#1/4/2002#,"A" .AddBar h,"Task",#1/6/2002#,#1/10/2002#,"B" .AddBar h,"Task",#1/11/2002#,#1/14/2002#,"C" .ItemBar(h,"A",257) = True .ItemBar(h,"B",257) = True End With .EndUpdate End With |
1183 |
I am using EBN to display my bars but the bars shows in black in the overview area. Is there any option to specify a different color in the overview part of the control
With G2antt1 .BeginUpdate .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" With .Chart .Bars.Item("Task").Color = &H1000000 .PaneWidth(False) = 48 .OverviewVisible = 2 .FirstVisibleDate = #1/11/2001# .LevelCount = 2 End With .Columns.Add "Column" With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,1 .ItemBar(h,1,41) = 8821418 .AddBar h,"Task",#2/2/2001#,#2/4/2001#,2 .ItemBar(h,2,41) = 8821418 h = .AddItem("Task 2") .AddBar h,"Task",#2/2/2001#,#2/4/2001#,"" .ItemBar(h,"",41) = 8821418 End With .EndUpdate End With |
1182 |
I haven't found options to localize (in Italian) the strings ( dates, tooltip ) that shows in the chart area
With G2antt1 .BeginUpdate With .Chart .LevelCount = 2 .PaneWidth(False) = 0 .Label(256) = "<|><%ww%><|><%d%> <%m3%> '<%yy%><r><%ww%><|><%d%> <%mmmm%> <%yyyy%><r><%ww%><||><||>256" .Label(4096) = "<|><%d1%><|><%d2%><|><%d3%><|><%dddd%><|><%d3%> <%d%> <%m3%> '<%yy%><|><%dddd%> <%d%> <%mmmm%> <%yyyy%><||><||>4096" .LabelToolTip(256) = "<%d%> <%mmmm%> <%yyyy%> <%ww%>" .LabelToolTip(4096) = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .FirstWeekDay = 1 .MonthNames = "gennaio febbraio marzo aprile maggio giugno luglio agosto settembre ottobre novembre dicembre" .WeekDays = "domenica lunedì martedì mercoledì giovedì venerdì sabato" .ToolTip = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .UnitScale = 4096 End With .EndUpdate End With |
1181 |
I haven't found options to localize (in Dutch) the strings ( dates, tooltip ) that shows in the chart area
With G2antt1 .BeginUpdate With .Chart .LevelCount = 2 .PaneWidth(False) = 0 .Label(256) = "<|><%ww%><|><%d%> <%m3%> '<%yy%><r><%ww%><|><%d%> <%mmmm%> <%yyyy%><r><%ww%><||><||>256" .Label(4096) = "<|><%d1%><|><%d2%><|><%d3%><|><%dddd%><|><%d3%> <%d%> <%m3%> '<%yy%><|><%dddd%> <%d%> <%mmmm%> <%yyyy%><||><||>4096" .LabelToolTip(256) = "<%d%> <%mmmm%> <%yyyy%> <%ww%>" .LabelToolTip(4096) = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .FirstWeekDay = 1 .MonthNames = "januari februari maart april mei juni juli augusts september oktober november december" .WeekDays = "zondag maandag dinsdag woensdag donderdag vrijdag zaterdag" .ToolTip = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .UnitScale = 4096 End With .EndUpdate End With |
1180 |
I haven't found options to localize (in German) the strings ( dates, tooltip ) that shows in the chart area (method 1)
With G2antt1 .BeginUpdate With .Chart .LevelCount = 2 .PaneWidth(False) = 0 .Label(256) = "<|><%ww%><|><%d%> <%m3%> '<%yy%><r><%ww%><|><%d%>.<%mmmm%> <%yyyy%><r><%ww%><||><||>256" .Label(4096) = "<|><%d1%><|><%d2%><|><%d3%><|><%dddd%><|><%d3%> <%d%>.<%m3%> '<%yy%><|><%dddd%> <%d%>.<%mmmm%> <%yyyy%><||><||>4096" .LabelToolTip(256) = "<%d%>.<%mmmm%> <%yyyy%> <%ww%>" .LabelToolTip(4096) = "<%dddd%>, <%d%>.<%mmmm%> <%yyyy%>" .FirstWeekDay = 1 .MonthNames = "Januar Februar März April Mai Juni Juli August September Oktober November Dezember" .WeekDays = "Sonntag Montag Dienstag Mittwoch Donnerstag Freitag Samstag" .ToolTip = "<%dddd%>,<%d%>.<%mmmm%> <%yyyy%>" .UnitScale = 4096 End With .EndUpdate End With |
1179 |
I haven't found options to localize (in French) the strings ( dates, tooltip ) that shows in the chart area
With G2antt1 .BeginUpdate With .Chart .LevelCount = 2 .PaneWidth(False) = 0 .Label(256) = "<|><%ww%><|><%d%> <%m3%> '<%yy%><r><%ww%><|><%d%> <%mmmm%> <%yyyy%><r><%ww%><||><||>256" .Label(4096) = "<|><%d1%><|><%d2%><|><%d3%><|><%dddd%><|><%d3%> <%d%> <%m3%> '<%yy%><|><%dddd%> <%d%> <%mmmm%> <%yyyy%><||><||>4096" .LabelToolTip(256) = "<%d%> <%mmmm%> <%yyyy%> <%ww%>" .LabelToolTip(4096) = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .FirstWeekDay = 1 .MonthNames = "janvier février mars avril mai juin juillet août septembre octobre novembre décembre" .WeekDays = "dimanche lundi mardi mercredi jeudi vendredi samedi" .ToolTip = "<%dddd%> <%d%> <%mmmm%> <%yyyy%>" .UnitScale = 4096 End With .EndUpdate End With |
1178 |
How can I determine the last visible date in the chart
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( "First" ) Debug.Print( .Chart.FirstVisibleDate ) Debug.Print( "Last" ) Debug.Print( .Chart.DateFromPoint(1,-1) ) End With End Sub With G2antt1 .BeginUpdate With .Chart .LevelCount = 2 .PaneWidth(False) = 1 End With .EndUpdate End With |
1177 |
How can I filter programatically using more columns
With G2antt1 .BeginUpdate .Chart.PaneWidth(True) = 0 .MarkSearchColumn = False With .Columns .Add "Car" .Add "Equipment" End With With .Items .CellValue(.AddItem("Mazda"),1) = "Air Bag" .CellValue(.AddItem("Toyota"),1) = "Air Bag,Air condition" .CellValue(.AddItem("Ford"),1) = "Air condition" .CellValue(.AddItem("Nissan"),1) = "Air Bag,ABS,ESP" .CellValue(.AddItem("Mazda"),1) = "Air Bag, ABS,ESP" .CellValue(.AddItem("Mazda"),1) = "ABS,ESP" End With With .Columns.Item("Car") .FilterType = 240 .Filter = "Mazda" End With With .Columns.Item("Equipment") .FilterType = 3 .Filter = "*ABS*|*ESP*" End With .ApplyFilter .EndUpdate End With |
1176 |
Do you have scheduling functionality in Gantt (meaning scheduling several activities (bars) depending on their start and finish dates with considering dependencies to other activities
' BarResize event - Occurs when a bar is moved or resized. Private Sub G2antt1_BarResize(ByVal Item As Long,ByVal Key As Variant) With G2antt1 .Items.SchedulePDM Item,Key End With End Sub With G2antt1 .BeginUpdate .Items.AllowCellValueToItemBar = True .Columns.Add "Task" .Columns.Add("Working").Def(18) = 258 With .Chart .Bars.Add("Task:Split").Shortcut = "Task" .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 96 .AllowLinkBars = False .AllowCreateBar = 0 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/2/2001#,#1/4/2001#,"" .AddLink "L1",h1,"",h2,"" h3 = .AddItem("Task 3") .AddBar h3,"Task",#1/2/2001#,#1/6/2001#,"" .AddLink "L2",h2,"",h3,"" .Link("L2",12) = "FF" .Link("L2",6) = 2 .Link("L2",7) = 2 h4 = .AddItem("Task 4") .AddBar h4,"Task",#1/2/2001#,#1/4/2001#,"" .AddLink "L3",h4,"",h3,"" .ItemBar(0,"<*>",20) = True .SchedulePDM .FirstVisibleItem,"" End With .EndUpdate End With |
1175 |
How can I show the ticks for a single slider field
With G2antt1 .BeginUpdate .Columns.Add("Slider").Editor.EditType = 20 With .Items .AddItem 10 With .CellEditor(.AddItem(20),0) .EditType = 20 .Option(53) = 10 End With .AddItem 30 End With .EndUpdate End With |
1174 |
Is it possible to show ticks for slider fields
With G2antt1 With .Columns.Add("Slider").Editor .EditType = 20 .Option(53) = 10 End With .Items.AddItem 10 End With |
1173 |
How can I group two bars so the distance between them is limited to a specified range
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 48 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#9/21/2006#,#9/24/2006# h2 = .AddItem("Task 2") .AddBar h2,"Unknown",#9/25/2006#,#9/28/2006# .AddLink "L1",h1,"",h2,"" .GroupBars h1,"",False,h2,"",True,31,"1;2" Debug.Print( "The distance between A and B is limited between 1 and 3 days" ) Debug.Print( "The B is always after the A" ) End With .EndUpdate End With |
1172 |
How can I group two bars so the distance between them is flexible but never less than a specified value
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 48 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#9/21/2006#,#9/24/2006# h2 = .AddItem("Task 2") .AddBar h2,"Unknown",#9/26/2006#,#9/29/2006# .AddLink "L1",h1,"",h2,"" .GroupBars h1,"",False,h2,"",True,39,"2" Debug.Print( "The distance between A and B is never less than 2 days" ) Debug.Print( "The B is always after the A" ) End With .EndUpdate End With |
1171 |
How can I group two bars so the distance between them is flexible
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 48 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#9/21/2006#,#9/24/2006# h2 = .AddItem("Task 2") .AddBar h2,"Unknown",#9/26/2006#,#9/29/2006# .AddLink "L1",h1,"",h2,"" .GroupBars h1,"",False,h2,"",True,39 Debug.Print( "The distance between A and B is flexible, unlimited" ) Debug.Print( "The B is always after the A" ) End With .EndUpdate End With |
1170 |
How can I group two bars so the interval between them is fixed
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 48 .LevelCount = 2 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#9/21/2006#,#9/24/2006#,"T1","A" .AddBar h,"Unknown",#9/26/2006#,#9/29/2006#,"T2","B" .AddLink "L",h,"T1",h,"T2" .Link("L",258) = 27 .Link("L",11) = False h2 = .AddItem("Task 2") .AddBar h2,"Unknown",#9/26/2006#,#9/29/2006#,"T2","B" .AddLink "L2",h,"T1",h2,"T2" .Link("L2",258) = 27 .Link("L2",11) = False Debug.Print( "The distance between bars is constant" ) Debug.Print( "The B is always after the A" ) End With .EndUpdate End With |
1169 |
How can I group two bars when linking, so moving the first bar will makes the second to move accordingly
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 48 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#9/21/2006#,#9/24/2006#,"","A" h2 = .AddItem("Task 2") .AddBar h2,"Unknown",#9/26/2006#,#9/29/2006#,"","B" .AddLink "L1",h1,"",h2,"" .Link("L1",258) = 39 Debug.Print( "The distance between A and B is flexible, unlimited" ) Debug.Print( "The B is always after the A" ) End With .EndUpdate End With |
1168 |
Is it possible to be notified when the user clicks an anchor element a hyperlink in the date-time zone
' AnchorClick event - Occurs when an anchor element is clicked. Private Sub G2antt1_AnchorClick(ByVal AnchorID As String,ByVal Options As String) With G2antt1 Debug.Print( "Click: " ) Debug.Print( AnchorID ) End With End Sub With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z",#1/2/2001#,#1/5/2001#,15753471,";32;Caption <a1><b>1</b></a>;1;Caption <a2><b>2</b></a>;17;Caption <a3><b>3</b></a>" End With .EndUpdate End With |
1167 |
Is it possible to be notified when the user clicks a date-time zone
' Click event - Occurs when the user presses and then releases the left mouse button over the tree control. Private Sub G2antt1_Click() With G2antt1 With .Chart Debug.Print( "Click: " ) Debug.Print( .TimeZoneFromPoint(-1,-1) ) End With End With End Sub With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z",#1/2/2001#,#1/5/2001#,16711680,";32;DATE-TIME<br> ZONE" End With .EndUpdate End With |
1166 |
Is is possible to display multiple captions in the same date-time zone
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z",#1/5/2001#,#1/8/2001#,12895487,";;Caption <b>1</b>;1;Caption <b>2</b>;17;Caption <b>3</b>" End With .EndUpdate End With |
1165 |
Is is possible to align on the top the caption for the date-time zone
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z",#1/5/2001#,#1/8/2001#,12895487,";;UpperCenter;1" End With .EndUpdate End With |
1164 |
Is there any option to display a picture on the date-time zone
With G2antt1 .BeginUpdate .HTMLPicture("pic1") = "c:\exontrol\images\card.png" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z",#1/5/2001#,#1/8/2001#,12895487,";;<c><img>pic1</img><br><c>picture" End With .EndUpdate End With |
1163 |
Is there any option to display a text or a HTML caption on the date-time zone
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .MarkTimeZone "Z1",#1/1/2001#,#1/4/2001#,12895487,";;zone <b>1</b>" .MarkTimeZone "Z2",#1/5/2001#,#1/8/2001#,12895487,";;zone <b>2</b>" End With .EndUpdate End With |
1162 |
How can I display the date-time zone using a semi-transparent EBN object
With G2antt1 .BeginUpdate .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/2/2001#,#1/3/2001#,16777056,";;Solid" .MarkTimeZone "Z2",#1/7/2001#,#1/10/2001#,16777216,"50;;EBN" End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1161 |
How can I display the date-time zone using an EBN or a skin instead a solid color
With G2antt1 .BeginUpdate .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/2/2001#,#1/3/2001#,16777056,";;Solid" .MarkTimeZone "Z2",#1/5/2001#,#1/8/2001#,16777216,";;EBN" End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1160 |
How can I display the date-time zone using a pattern instead a solid color
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/2/2001#,#1/3/2001#,16777056,";;Solid" .MarkTimeZone "Z2",#1/6/2001#,#1/7/2001#,16777056,";12;Pattern" End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1159 |
How can I display the date-time zone using a transparent color
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/2/2001#,#1/3/2001#,16777056,";;Opaque" .MarkTimeZone "Z2",#1/6/2001#,#1/7/2001#,16777056,"50;;Semi-Transparent" End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1158 |
The date time zone is shown behind the bars, is there any way to show it over
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/28/2000# .PaneWidth(False) = 48 .AllowLinkBars = False .AllowCreateBar = 0 .Bars.Item("Task").Pattern = 1 .MarkTimeZone "Z1",#1/2/2001#,#1/3/2001#,16777056 .MarkTimeZone "Z2",#1/6/2001#,#1/7/2001#,16777056,"1" End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/8/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" End With .EndUpdate End With |
1157 |
How can I get ifnromation about a date-time zone
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 With .Chart Debug.Print( .TimeZoneInfo(.TimeZoneFromPoint(-1,-1)) ) End With End With End Sub With G2antt1 With .Chart .PaneWidth(False) = 18 .LevelCount = 2 .FirstVisibleDate = #1/1/2010# .MarkTimeZone "Z1",#1/4/2010#,#1/8/2010#,16744544 .MarkTimeZone "Z2",#1/12/2010#,#1/18/2010#,16761952 End With End With |
1156 |
How can I determine the zone from the cursor
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 With .Chart Debug.Print( .TimeZoneFromPoint(-1,-1) ) End With End With End Sub With G2antt1 With .Chart .PaneWidth(False) = 18 .LevelCount = 2 .FirstVisibleDate = #1/1/2010# .MarkTimeZone "Z1",#1/4/2010#,#1/8/2010#,16744544 .MarkTimeZone "Z2",#1/12/2010#,#1/18/2010#,16761952 End With End With |
1155 |
How can I highlight multiple date-time zones (ranges)
With G2antt1 With .Chart .PaneWidth(False) = 18 .LevelCount = 2 .FirstVisibleDate = #1/1/2010# .MarkTimeZone "Z1",#1/4/2010#,#1/8/2010#,16744544 .MarkTimeZone "Z2",#1/12/2010#,#1/18/2010#,16761952 End With End With |
1154 |
How can I highlight a date-time range
With G2antt1 With .Chart .PaneWidth(False) = 18 .LevelCount = 2 .FirstVisibleDate = #1/1/2010# .MarkTimeZone "Z1",#1/4/2010#,#1/8/2010#,16744544 End With End With |
1153 |
How do I get the list of selected date
' ChartEndChanging event - Occurs after the chart has been changed. Private Sub G2antt1_ChartEndChanging(ByVal Operation As Long) With G2antt1 Debug.Print( Operation ) Debug.Print( .Chart.SelectDates ) End With End Sub With G2antt1 With .Chart .LevelCount = 2 .PaneWidth(False) = 0 .MarkTodayColor = .BackColor End With End With |
1152 |
Is there any function I can use to find the bars that intersect with the current bar
' BarResizing event - Occurs when a bar is moving or resizing. Private Sub G2antt1_BarResizing(ByVal Item As Long,ByVal Key As Variant) With G2antt1 With .Items Debug.Print( Key ) Debug.Print( "intesect with" ) Debug.Print( .ItemBar(Item,Key,520) ) End With End With End Sub With G2antt1 .BeginUpdate .DefaultItemHeight = 22 .Columns.Add "Task" .ScrollBySingleLine = True .DrawGridLines = -1 With .Chart .DrawGridLines = -1 .PaneWidth(False) = 48 .FirstVisibleDate = #12/28/2000# .LevelCount = 2 .Bars.Item("Task").OverlaidType = 1 .ResizeUnitScale = 65536 .AllowCreateBar = 1 End With With .Items h1 = .AddItem("Default") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"A1","A1" .AddBar h1,"Task",#1/3/2001#,#1/5/2001#,"A2","A2" .AddBar h1,"Task",#1/4/2001#,#1/7/2001#,"A3","A3" End With .EndUpdate End With |
1151 |
Is it possible to order the bars on top of other bars
With G2antt1 .BeginUpdate .DefaultItemHeight = 22 .Columns.Add "Task" .ScrollBySingleLine = True .DrawGridLines = -1 With .Chart .DrawGridLines = -1 .PaneWidth(False) = 48 .FirstVisibleDate = #12/28/2000# .LevelCount = 2 .Bars.Copy("Task","NTask").OverlaidType = 1 End With With .Items h1 = .AddItem("Default") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"A1" .AddBar h1,"Task",#1/3/2001#,#1/5/2001#,"A2" .AddBar h1,"Task",#1/4/2001#,#1/7/2001#,"A3" h2 = .AddItem("Overlaid") .AddBar h2,"NTask",#1/2/2001#,#1/4/2001#,"A1" .AddBar h2,"NTask",#1/3/2001#,#1/5/2001#,"A2" .AddBar h2,"NTask",#1/4/2001#,#1/7/2001#,"A3" .GroupBars h1,"A1",True,h2,"A1",True .GroupBars h1,"A1",False,h2,"A1",False .GroupBars h1,"A2",True,h2,"A2",True .GroupBars h1,"A2",False,h2,"A2",False .GroupBars h1,"A3",True,h2,"A3",True .GroupBars h1,"A3",False,h2,"A3",False End With .EndUpdate End With |
1150 |
Is it possible to order the bars on top of other bars (have different colurs so that they can be seen)
With G2antt1 .BeginUpdate .DefaultItemHeight = 22 .Columns.Add "Task" .ScrollBySingleLine = True .DrawGridLines = -1 With .Chart .DrawGridLines = -1 .PaneWidth(False) = 48 .FirstVisibleDate = #12/28/2000# .LevelCount = 2 .Bars.Copy("Task","NTask").OverlaidType = 515 ' OverlaidBarsTypeEnum.exOverlaidBarsStackAutoArrange Or OverlaidBarsTypeEnum.exOverlaidBarsStack End With With .Items h1 = .AddItem("Default") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"A1" .AddBar h1,"Task",#1/3/2001#,#1/5/2001#,"A2" .AddBar h1,"Task",#1/4/2001#,#1/7/2001#,"A3" h2 = .AddItem("Overlaid") .AddBar h2,"NTask",#1/2/2001#,#1/4/2001#,"A1" .AddBar h2,"NTask",#1/3/2001#,#1/5/2001#,"A2" .AddBar h2,"NTask",#1/4/2001#,#1/7/2001#,"A3" .GroupBars h1,"A1",True,h2,"A1",True .GroupBars h1,"A1",False,h2,"A1",False .GroupBars h1,"A2",True,h2,"A2",True .GroupBars h1,"A2",False,h2,"A2",False .GroupBars h1,"A3",True,h2,"A3",True .GroupBars h1,"A3",False,h2,"A3",False End With .EndUpdate End With |
1149 |
Is it possible to layer bars on top of other bars (have different colurs so that they can be seen)
With G2antt1 .BeginUpdate .DefaultItemHeight = 22 .Columns.Add "Task" With .Chart .PaneWidth(False) = 48 .FirstVisibleDate = #12/28/2000# .LevelCount = 2 .Bars.Copy("Task","NTask").OverlaidType = 1 End With With .Items h1 = .AddItem("Default") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"A1" .AddBar h1,"Task",#1/3/2001#,#1/5/2001#,"A2" .AddBar h1,"Task",#1/4/2001#,#1/7/2001#,"A3" h2 = .AddItem("Overlaid") .AddBar h2,"NTask",#1/2/2001#,#1/4/2001#,"A1" .AddBar h2,"NTask",#1/3/2001#,#1/5/2001#,"A2" .AddBar h2,"NTask",#1/4/2001#,#1/7/2001#,"A3" .GroupBars h1,"A1",True,h2,"A1",True .GroupBars h1,"A1",False,h2,"A1",False .GroupBars h1,"A2",True,h2,"A2",True .GroupBars h1,"A2",False,h2,"A2",False .GroupBars h1,"A3",True,h2,"A3",True .GroupBars h1,"A3",False,h2,"A3",False End With .EndUpdate End With |
1148 |
My skin(EBN) bars are not shown a different color in the overview. What can I do
With G2antt1 .BeginUpdate .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" With .Chart .Bars.Item("Task").Color = &H1000000 .PaneWidth(False) = 48 .OverviewVisible = 2 .FirstVisibleDate = #1/11/2001# .LevelCount = 2 End With .Columns.Add "Column" With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,1 .AddBar h,"Task",#2/2/2001#,#2/4/2001#,2 .ItemBar(h,2,33) = 16776960 h = .AddItem("Task 2") .AddBar h,"Task",#2/2/2001#,#2/4/2001#,"" .ItemBar(h,"",33) = 255 End With .EndUpdate End With |
1147 |
How do I colour the lines in the overview section to match the bars they represent on the main chart
With G2antt1 .BeginUpdate With .Chart .PaneWidth(False) = 48 .OverviewVisible = 2 .FirstVisibleDate = #1/1/2001# .LevelCount = 2 End With .Columns.Add "Column" With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,1 .AddBar h,"Task",#2/2/2001#,#2/4/2001#,2 h = .AddItem("Task 2") .AddBar h,"Task",#2/2/2001#,#2/4/2001#,"" .ItemBar(h,"",33) = 255 End With .EndUpdate End With |
1146 |
How do I catch the delete key (down) on a bar
' KeyDown event - Occurs when the user presses a key while an object has the focus. Private Sub G2antt1_KeyDown(KeyCode As Integer,ByVal Shift As Integer) With G2antt1 Debug.Print( KeyCode ) Debug.Print( Shift ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/27/2000# .LevelCount = 2 .PaneWidth(False) = 48 With .Bars.Item("Task") .Pattern = 32 .Height = 13 End With End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1","This is a bit of text that is not clipped" h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1","This is a bit of text that get's clipped" .ItemBar(h,"K1",4) = 3 .ItemBar(h,"K1",6) = .ItemBar(h,"K1",3) End With .EndUpdate End With |
1145 |
Is it possible to colour a particular column, I mean the cell's foreground color
With G2antt1 .BeginUpdate With .ConditionalFormats.Add("1") .ForeColor = RGB(255,0,0) .ApplyTo = 1 ' &H1 End With .MarkSearchColumn = False With .Columns .Add "Column 1" .Add "Column 2" End With With .Items .CellValue(.AddItem(0),1) = 1 .CellValue(.AddItem(2),1) = 3 .CellValue(.AddItem(4),1) = 5 End With .EndUpdate End With |
1144 |
Is it possible to colour a particular column for specified values
With G2antt1 .BeginUpdate With .ConditionalFormats.Add("int(%1) in (3,4,5)") .BackColor = RGB(255,0,0) .ApplyTo = 1 ' &H1 End With .MarkSearchColumn = False With .Columns .Add "Column 1" .Add "Column 2" End With With .Items .CellValue(.AddItem(0),1) = 1 .CellValue(.AddItem(2),1) = 3 .CellValue(.AddItem(4),1) = 5 End With .EndUpdate End With |
1143 |
Is it possible to colour a particular column
With G2antt1 .BeginUpdate .MarkSearchColumn = False With .Columns .Add "Column 1" .Add("Column 2").Def(4) = 255 End With With .Items .CellValue(.AddItem(0),1) = 1 .CellValue(.AddItem(2),1) = 3 .CellValue(.AddItem(4),1) = 5 End With .EndUpdate End With |
1142 |
How do i get all the children items that are under a certain parent Item handle
With G2antt1 .BeginUpdate .LinesAtRoot = -1 .Columns.Add "P" With .Items h = .AddItem("Root") .InsertItem h,,"Child 1" .InsertItem h,,"Child 2" .ExpandItem(h) = True End With With .Items hChild = .ItemChild(.FirstVisibleItem) Debug.Print( .CellValue(hChild,0) ) Debug.Print( .CellValue(.NextSiblingItem(hChild),0) ) End With .EndUpdate End With |
1141 |
How can I access the control's scroll bar so I can change its appearance
With G2antt1 .BeginUpdate .Chart.PaneWidth(False) = 0 .VisualAppearance.Add 1,"c:\exontrol\images\normal.ebn" .Background(388) = &H1000000 .EndUpdate End With |
1140 |
How can I show my bars using the parts of the current theme
With G2antt1 .BeginUpdate With .VisualAppearance .Add 1,"XP:Button 1 1" .Add 2,"XP:Button 1 2" .Add 3,"XP:ScrollBar 3 1" .Add 4,"XP:ScrollBar 3 2" End With With .Chart .PaneWidth(False) = 48 .FirstVisibleDate = #1/1/2001# With .Bars .Add("B1").Color = &H1000000 .Add("B2").Color = &H2000000 .Add("S1").Color = &H3000000 .Add("S2").Color = &H4000000 End With End With .Columns.Add "Column" With .Items .AddBar .AddItem("Button1"),"B1",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Button 2"),"B2",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Scrollbar 1"),"S1",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Scrollbar 2"),"S2",#1/2/2001#,#1/4/2001# End With .EndUpdate End With |
1139 |
How do I hide the text on a bar if the text is to big for the bar length
With G2antt1 .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/27/2000# .LevelCount = 2 .PaneWidth(False) = 48 With .Bars.Item("Task") .Pattern = 32 .Height = 13 End With End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1","This is a bit of text that is not clipped" h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K1","This is a bit of text that get's clipped" .ItemBar(h,"K1",4) = 3 .ItemBar(h,"K1",6) = .ItemBar(h,"K1",3) End With End With |
1138 |
Is it possible to change the color for non-working parts of the bar
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .LevelCount = 2 .PaneWidth(False) = 48 .FirstVisibleDate = #1/1/2001# .Bars.Add("Task:Split").Shortcut = "Task" .NonworkingDaysColor = RGB(240,250,240) End With With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001#,#1/16/2001# h = .AddItem("Task 2") .AddBar h,"Task",#1/2/2001#,#1/16/2001#,"" .ItemBar(h,"",40) = 65280 End With .EndUpdate End With |
1137 |
Is it possible to change the color for the percent bar being displayed inside a specified bar only
With G2antt1 .Columns.Add "Task" .Chart.FirstVisibleDate = #1/1/2001# .Chart.Bars.Add "Task%Progress" .Chart.PaneWidth(False) = 48 With .Items h = .AddItem("Task 1") .AddBar h,"Task%Progress",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.4 h = .AddItem("Task 2") .AddBar h,"Task%Progress",#1/2/2001#,#1/6/2001#,"K1" .ItemBar(h,"K1",12) = 0.5 .ItemBar(h,"K1",39) = 255 End With End With |
1136 |
How do I get a handle on the item before adding the bar
With G2antt1 .BeginUpdate .MarkSearchColumn = False .OnResizeControl = 1 .Columns.Add "Tasks" .Columns.Add("Start").Visible = False .Columns.Add("End").Visible = False With .Chart .FirstVisibleDate = #9/20/2006# .PaneWidth(0) = 64 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 0") .CellValue(h1,1) = #9/21/2006# .CellValue(h1,2) = #9/24/2006# .AddBar h1,"Task",.CellValue(h1,1),.CellValue(h1,2) h2 = .InsertItem(h,,"Task 1") .CellValue(h2,1) = #9/25/2006# .CellValue(h2,2) = #9/28/2006# .AddBar h2,"Task",.CellValue(h2,1),.CellValue(h2,2) h3 = .InsertItem(h,,"Task 2") .CellValue(h3,1) = #9/29/2006# .CellValue(h3,2) = #10/2/2006# .AddBar h3,"Task",.CellValue(h3,1),.CellValue(h3,2) .AddItem .ItemCount End With .EndUpdate End With |
1135 |
Is there an Items method that I can use to loop around to compare the item's user data against
With G2antt1 .Columns.Add "Default" With .Items h = .AddItem("Root 1") .InsertItem h,,"Child 1" .ItemData(.InsertItem(h,,"Child 2")) = 1234 .ExpandItem(h) = True .ItemBold(.FindItemData(1234)) = True End With End With |
1134 |
How do I make the tooltip box wider to allow for longer text
With G2antt1 .ToolTipWidth = 328 .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/4/2001#,"K1" .ItemBar(h,"K1",6) = "This is a bit of text that's displayed when the cursor hovers the bar" End With End With |
1133 |
How do i set the default timeslots to say hours or minutes
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .OverviewVisible = 2 .LevelCount = 2 .AllowOverviewZoom = 1 .OverviewZoomUnit = 24 .OverviewZoomCaption = "Y|½Y|¼Y|Mo|T|W|D|H|Mi|S" .UnitScale = 1048576 End With .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/16/2001#,#1/25/2001# .AddBar .AddItem("Item 3"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 4"),"Task",#2/16/2001#,#2/25/2001# End With .EndUpdate End With |
1132 |
Can I use icons or images in the text in the overview zoom buttons (Sec., Min., Hour, Month...)
With G2antt1 .BeginUpdate .HTMLPicture("pic1") = "c:\exontrol\images\zipdisk.gif" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .OverviewVisible = 2 .LevelCount = 2 .AllowOverviewZoom = 1 .OverviewZoomUnit = 24 .OverviewHeight = 58 .OverviewZoomCaption = "Y<br>e<br>a<br>r|½Y|¼Y|M<br>o<br>n<br>t<br>h|T|W<br>e<br>e<br>w|<img>pic1:28<img>|H<br>o<br>u<br>r|M<br>i<br>n|S<br>e<br>c" End With .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/16/2001#,#1/25/2001# .AddBar .AddItem("Item 3"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 4"),"Task",#2/16/2001#,#2/25/2001# End With .EndUpdate End With |
1131 |
Can I use icons or images in the text in the overview zoom buttons (Sec., Min., Hour, Month...)
With G2antt1 .BeginUpdate .Images "gBJJgBAIDAAGAAEAAQhYAf8Pf4hh0QihCJo2AEZjQAjEZFEaIEaEEaAIAkcbk0olUrlktl0vmExmUzmk1m03nE5nU7nk9n0/oFBoVDolFo1HpFJpVLplNp1PqFRqVTq" & _ "lVq1XrFZrVbrldr1fsFhsVjslls1ntFptVrtltt1vuFxuVzul1u13vF5vV7vl9v1/wGBwWDwmFw2HxGJxWLxmNx0xiFdyOTh8Tf9ZymXx+QytcyNgz8r0OblWjyWds+m" & _ "0ka1Vf1ta1+r1mos2xrG2xeZ0+a0W0qOx3GO4NV3WeyvD2XJ5XL5nN51aiw+lfSj0gkUkAEllHanHI5j/cHg8EZf7w8vl8j4f/qfEZeB09/vjLAB30+kZQAP/P5/H6/y" & _ "NAOAEAwCjMBwFAEDwJBMDwLBYAP2/8Hv8/gAGAD8LQs9w/nhDY/oygIA=" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .OverviewVisible = 2 .LevelCount = 2 .AllowOverviewZoom = 1 .OverviewZoomUnit = 24 .OverviewZoomCaption = "Y|½Y|¼Y|<img>2<img>|T|W|<img>1<img>|H|M|S" End With .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/16/2001#,#1/25/2001# .AddBar .AddItem("Item 3"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 4"),"Task",#2/16/2001#,#2/25/2001# End With .EndUpdate End With |
1130 |
How do I change (for localisation) the text in the buttons like (Sec., Min., Hour, Month...)
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .OverviewVisible = 2 .LevelCount = 2 .AllowOverviewZoom = 1 .OverviewZoomUnit = 24 .OverviewZoomCaption = "Y|½Y|¼Y|Mo|T|W|D|H|Mi|S" End With .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 2"),"Task",#1/16/2001#,#1/25/2001# .AddBar .AddItem("Item 3"),"Task",#1/2/2001#,#1/4/2001# .AddBar .AddItem("Item 4"),"Task",#2/16/2001#,#2/25/2001# End With .EndUpdate End With |
1129 |
How I can change the Months and Weekdays
With G2antt1 .BeginUpdate With .Chart .PaneWidth(False) = 0 .FirstVisibleDate = #2/1/2010# .LevelCount = 2 .UnitWidth = 10 .MonthNames = "1 2 3 4 5 6 7 8 9 10 11 12" .WeekDays = "A B C D E F G" With .Level(0) .Label = "<%mmmm%>" .Unit = 16 End With With .Level(1) .Label = "<font ;6><%ddd%>" .Unit = 4096 End With End With .EndUpdate End With |
1128 |
How do i get the current window time frame (the start and end) of the gantt chart
' DateChange event - Occurs when the first visible date is changed. Private Sub G2antt1_DateChange() With G2antt1 With .Chart Debug.Print( "Start" ) Debug.Print( .FirstVisibleDate ) Debug.Print( "" ) Debug.Print( "End" ) Debug.Print( .DateFromPoint(.PaneWidth(True),0) ) End With End With End Sub With G2antt1 .BeginUpdate With .Chart .PaneWidth(False) = 1 .LevelCount = 2 .ScrollTo #1/1/2010#,0 End With .EndUpdate End With |
1127 |
When I use this Chart.get_DateFromPoint(exg2antt1.Width, 0) I get date as 0, 30/12/1899, or 12:00:00 AM. What that means
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.DateFromPoint(-1,-1) ) End With End Sub With G2antt1 With .Chart .PaneWidth(False) = 48 .LevelCount = 2 End With End With |
1126 |
How do I enable grabing bars to other items/rows (and only enable them to be dropped on certain rows)
' BarParentChange event - Occurs just before moving a bar from current item to another item. Private Sub G2antt1_BarParentChange(ByVal Item As Long,ByVal Key As Variant,ByVal NewItem As Long,Cancel As Boolean) With G2antt1 Debug.Print( .Items.CellCaption(NewItem,0) ) Cancel = .Items.ItemData(NewItem) End With End Sub With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .AllowLinkBars = False .Bars.Item("Task").OverlaidType = 257 ' OverlaidBarsTypeEnum.exOverlaidBarsTransparent Or OverlaidBarsTypeEnum.exOverlaidBarsOffset End With .Columns.Add "Column" With .Items h = .AddItem("Item 1") .EnableItem(h) = False .ItemData(h) = -1 h = .AddItem("Item 2") .ItemData(h) = 0 .AddBar h,"Task",#1/5/2001#,#1/7/2001#,"B" .ItemBar(h,"B",28) = True .ItemData(.AddItem("Item 3")) = 0 h = .AddItem("Item 4") .EnableItem(h) = False .ItemData(h) = -1 End With .EndUpdate End With |
1125 |
How can I find out if a date time is a non-working part
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 h = .ItemFromPoint(-1,-1,c,hit) d = .Chart.DateFromPoint(-1,-1) Debug.Print( d ) Debug.Print( .Chart.IsNonworkingDate(d,h) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "NonWorking" With .Chart .FirstWeekDay = 1 .FirstVisibleDate = #1/24/2008# .PaneWidth(False) = 64 .LevelCount = 2 End With With .Items h = .AddItem("Default") h = .AddItem("January") .ItemNonworkingUnits(h,False) = "month(value) = 1" h = .AddItem("February, Saturday, Sunday") .ItemNonworkingUnits(h,False) = "month(value) = 2 or (weekday(value) = 0 or weekday(value) = 6)" h = .AddItem("Sunday") .ItemNonworkingUnits(h,False) = "weekday(value) = 0" End With .EndUpdate End With |
1124 |
I am using the ItemBar property exBarCanMoveToAnother, How do I stop it from being dropped on certain chart rows
' BarParentChange event - Occurs just before moving a bar from current item to another item. Private Sub G2antt1_BarParentChange(ByVal Item As Long,ByVal Key As Variant,ByVal NewItem As Long,Cancel As Boolean) With G2antt1 Debug.Print( .Items.CellCaption(NewItem,0) ) Cancel = .Items.ItemData(NewItem) End With End Sub With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 .AllowLinkBars = False .Bars.Item("Task").OverlaidType = 257 ' OverlaidBarsTypeEnum.exOverlaidBarsTransparent Or OverlaidBarsTypeEnum.exOverlaidBarsOffset End With .Columns.Add "Column" With .Items h = .AddItem("Item 1") .EnableItem(h) = False .ItemData(h) = -1 h = .AddItem("Item 2") .ItemData(h) = 0 .AddBar h,"Task",#1/5/2001#,#1/7/2001#,"B" .ItemBar(h,"B",28) = True .ItemData(.AddItem("Item 3")) = 0 .ItemData(.AddItem("Item 4")) = 0 End With .EndUpdate End With |
1123 |
What is the event I should use to capture the click event on the task item on left hand side
' Click event - Occurs when the user presses and then releases the left mouse button over the tree control. Private Sub G2antt1_Click() With G2antt1 h = .ItemFromPoint(-1,-1,c,hit) Debug.Print( .Items.CellCaption(h,c) ) End With End Sub With G2antt1 .BeginUpdate .LinesAtRoot = -1 .Columns.Add "Items" With .Items h = .AddItem("R1") .InsertItem h,,"Cell 1.1" .InsertItem h,,"Cell 1.2" .ExpandItem(h) = True h = .AddItem("R2") .InsertItem h,,"Cell 2.1" .InsertItem h,,"Cell 2.2" .ExpandItem(h) = True End With .EndUpdate End With |
1122 |
Can I add a hyperlink assigned to a bar
' AnchorClick event - Occurs when an anchor element is clicked. Private Sub G2antt1_AnchorClick(ByVal AnchorID As String,ByVal Options As String) With G2antt1 Debug.Print( AnchorID ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "default" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 2") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "<a1><b>A 1</b></a>" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 3") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "<a2><b>A 2</b></a>" .ItemBar(h,"K",4) = 18 End With .EndUpdate End With |
1121 |
Can I change the background color only for the text (caption) in a bar
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "default" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 2") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "using <bgcolor=FF0000>bgcolor</bgcolor> HTML attribute " .ItemBar(h,"K",4) = 18 End With .EndUpdate End With |
1120 |
Can I change the font to display the text (caption) in a bar
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "default" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 2") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "<font Segoe UI;8 >using font HTML attribute </fgcolor>" .ItemBar(h,"K",4) = 18 End With .EndUpdate End With |
1119 |
How do i change the forecolor of text (caption) in a bar
With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #1/1/2001# .PaneWidth(False) = 48 End With With .Items h = .AddItem("Task 1") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "default" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 2") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "<fgcolor=FF0000>using fgcolor HTML attribute </fgcolor>" .ItemBar(h,"K",4) = 18 h = .AddItem("Task 3") .AddBar h,"Task",#1/2/2001#,#1/6/2001#,"K" .ItemBar(h,"K",3) = "using exBarForeColor" .ItemBar(h,"K",4) = 18 .ItemBar(h,"K",8) = 65280 End With .EndUpdate End With |
1118 |
I have noticed that when scrolling horizontally the chart a tooltip shown. is it possible to actually do the scrolling without showing the tooltip
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #6/20/2005# .AllowLinkBars = True .LevelCount = 2 .PaneWidth(0) = 48 .ToolTip = "" End With With .Items .AddBar .AddItem("Task 1"),"Task",#6/21/2005#,#6/25/2005#,"A" .AddBar .AddItem("Task 2"),"Task",#6/28/2005#,#7/2/2005#,"B" End With .EndUpdate End With |
1117 |
How can I add a bar to be treated as a nonworking part like a "holidays" bar
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .LevelCount = 2 .PaneWidth(False) = 48 .AllowNonworkingBars = True .Bars.Add("Task:Split").Shortcut = "Task" End With .Columns.Add "Tasks" With .Items h = .AddItem("Task 1") .ItemNonworkingUnits(h,False) = "weekday(value) in (0,6)" .AddBar h,"",#1/2/2001#,#1/5/2001#,"A","holyday" .ItemBar(h,"A",38) = True .AddBar h,"Task",#1/5/2001#,#1/12/2001#,"Z" .ItemBar(h,"Z",20) = True End With .EndUpdate End With |
1116 |
Is it possible to add bars that act like a non-working fixed part or the item
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .LevelCount = 2 .PaneWidth(False) = 48 .AllowNonworkingBars = True End With .Columns.Add "Tasks" With .Items h = .AddItem("Task 1") .ItemNonworkingUnits(h,False) = "weekday(value) in (0,6)" .AddBar h,"",#1/3/2001#,#1/6/2001#,"h","holyday" .ItemBar(h,"h",38) = True .ItemBar(h,"h",29) = False End With .EndUpdate End With |
1115 |
Is it possible to add bars that act like a non-working part or the item
With G2antt1 .BeginUpdate With .Chart .FirstVisibleDate = #1/1/2001# .LevelCount = 2 .PaneWidth(False) = 48 .AllowNonworkingBars = True End With .Columns.Add "Tasks" With .Items h = .AddItem("Task 1") .ItemNonworkingUnits(h,False) = "weekday(value) in (0,6)" .AddBar h,"",#1/3/2001#,#1/6/2001#,"h","holyday" .ItemBar(h,"h",38) = True End With .EndUpdate End With |
1114 |
How can I change the both dates for the bar at once
With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .PaneWidth(0) = 64 .FirstVisibleDate = #6/21/2005# .ShowEmptyBars = 1 End With With .Items h = .AddItem("Test") .AddBar h,"Task",#6/22/2005#,#6/26/2005#,"" .AddBar h,"Task",#6/27/2005#,#6/29/2005# End With .EndUpdate End With |
1113 |
How can I get the selected bars in the chart
' ChartSelectionChanged event - Occurs when the user selects objects in the chart area. Private Sub G2antt1_ChartSelectionChanged() With G2antt1 Debug.Print( .Items.SelectedObjects(1) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #6/20/2005# .AllowLinkBars = True .LevelCount = 2 .PaneWidth(0) = 48 End With With .Items .AddBar .AddItem("Task 1"),"Task",#6/21/2005#,#6/25/2005#,"A" .AddBar .AddItem("Task 2"),"Task",#6/28/2005#,#7/2/2005#,"B" .ItemBar(.FirstVisibleItem,.FirstItemBar(.FirstVisibleItem),257) = True End With .EndUpdate End With |
1112 |
How can I list the actions that can be performed by undo operations
' ChartEndChanging event - Occurs after the chart has been changed. Private Sub G2antt1_ChartEndChanging(ByVal Operation As Long) With G2antt1 Debug.Print( .Chart.UndoListAction() ) End With End Sub With G2antt1 .BeginUpdate .Chart.FirstVisibleDate = #1/1/2001# .Chart.AllowLinkBars = False .Chart.Bars.Item("Task").OverlaidType = 257 ' OverlaidBarsTypeEnum.exOverlaidBarsTransparent Or OverlaidBarsTypeEnum.exOverlaidBarsOffset .Chart.AllowUndoRedo = True .Chart.PaneWidth(False) = 32 .Chart.Bars.Add("Task:Split").Shortcut = "Task" .Columns.Add "Column" With .Items .AddBar .AddItem("Item 1"),"Task",#1/2/2001#,#1/4/2001#,"A" h = .AddItem("Item 2") .AddBar h,"Task",#1/5/2001#,#1/9/2001#,"B" .ItemBar(h,"B",28) = True .ItemBar(h,"B",20) = True .ItemNonworkingUnits(.AddItem("Item 3"),False) = "weekday(value)=0" .ItemNonworkingUnits(.AddItem("Item 4"),False) = "weekday(value) in (3,5)" End With .EndUpdate End With |
1111 |
How can I change the predefined labels being displayed in the chart's header so it shows the data in short format with no literals
With G2antt1 .BeginUpdate With .Chart .PaneWidth(False) = 0 .AllowOverviewZoom = 1 .OverviewVisible = 2 .LevelCount = 3 .Label(0) = "<%yy%><|><%yyyy%>" .Label(1) = "" .Label(2) = "" .Label(16) = "<|><%m%><|><%m%>/<%yy%><|><%m%>/<%yyyy%>" .Label(17) = "" .Label(256) = "<|><%ww%><|><%m%>/<%d%>/<%yy%><r><%ww%><|><%m%>/<%d%>/<%yyyy%><r><%ww%><||><||>256" .Label(4096) = "<|><%d%><|><%m%>/<%d%>/<%yy%><|><%m%>/<%d%>/<%yyyy%><||><||>4096" .Label(65536) = "<|><%hh%><|><%m%>/<%d%>/<%yy%> <%h%> <%AM/PM%><|><%m%>/<%d%>/<%yyyy%> <%h%> <%AM/PM%><||><||>65536" .Label(1048576) = "<|><%nn%><|><%h%>:<%nn% <%AM/PM%>><|><%m%>/<%d%>/<%yy%> <%h%>:<%nn%> <%AM/PM%><|><%m%>/<%d%>/<%yyyy%> <%h%>:<%nn%> <%AM/PM%>" .Label(16777216) = "<|><%ss%><|><%nn%>:<%ss%><|><%h%>:<%nn%>:<%ss%> <%AM/PM%><|><%m%>/<%d%>/<%yy%> <%h%>:<%nn%>:<%ss%> <%AM/PM%><|><%m%>/<%d%>/<%yy" & _ "yy%> <%h%>:<%nn%>:<%ss%> <%AM/PM%>" .LabelToolTip(0) = "<%yyyy%>" .LabelToolTip(1) = "" .LabelToolTip(2) = "" .LabelToolTip(16) = "<%m%>/<%yyyy%>" .LabelToolTip(17) = "" .LabelToolTip(256) = "<%m%>/<%d%>/<%yyyy%> <%ww%>" .LabelToolTip(4096) = "<%m%>/<%d%>/<%yyyy%>" .LabelToolTip(65536) = "<%m%>/<%d%>/<%yyyy%> <%h%> <%AM/PM%>" .LabelToolTip(1048576) = "<%m%>/<%d%>/<%yyyy%> <%h%>:<%nn%> <%AM/PM%>" .LabelToolTip(16777216) = "<%m%>/<%d%>/<%yyyy%> <%h%>:<%nn%>:<%ss%> <%AM/PM%>" .UnitScale = 4096 End With .EndUpdate End With |
1110 |
The histogram does not show (correctly) the bars, even if I changed the Bar.HistogramPattern and Bar.HistogramColor properties. What can be wrong
With G2antt1 .BeginUpdate With .Chart .PaneWidth(False) = 48 .FirstVisibleDate = #12/27/2000# .HistogramVisible = True .HistogramHeight = 32 With .Bars.Item("Task") .HistogramPattern = 6 .HistogramColor = RGB(255,0,0) End With .ResizeUnitScale = 65536 End With .Columns.Add "Column" With .Items .AddBar .AddItem("Task 1"),"Task",#1/2/2001 8:00:00 AM#,#1/2/2001 0:00:00 PM# .AddBar .AddItem("Task 2"),"Task",#1/1/2001 8:00:00 AM#,#1/5/2001 0:00:00 PM# End With .EndUpdate End With |
1109 |
How can I change the default key for the newly added link from "Link1" to my identifier
' AddLink event - Occurs when the user links two bars using the mouse. Private Sub G2antt1_AddLink(ByVal LinkKey As String) With G2antt1 With .Items .AddLink "newIDlink",.Link(LinkKey,0),.Link(LinkKey,1),.Link(LinkKey,2),.Link(LinkKey,3) .RemoveLink LinkKey End With End With End Sub ' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.LinkFromPoint(-1,-1) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #6/20/2005# .AllowLinkBars = True .LevelCount = 2 .PaneWidth(0) = 48 End With With .Items .AddBar .AddItem("Task 1"),"Task",#6/21/2005#,#6/25/2005#,"" .AddBar .AddItem("Task 2"),"Task",#6/28/2005#,#7/2/2005#,"" End With .EndUpdate End With |
1108 |
How can I change the default key for the newly added link from "Link1" to my identifier
' AllowLink event - Notifies at runtime when a link between two bars is possible. Private Sub G2antt1_AllowLink(ByVal StartItem As Long,ByVal StartBarKey As Variant,ByVal EndItem As Long,ByVal EndBarKey As Variant,LinkKey As Variant,Cancel As Boolean) With G2antt1 LinkKey = "newIDlink" End With End Sub ' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.LinkFromPoint(-1,-1) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Tasks" With .Chart .FirstVisibleDate = #6/20/2005# .AllowLinkBars = True .LevelCount = 2 .PaneWidth(0) = 48 End With With .Items .AddBar .AddItem("Task 1"),"Task",#6/21/2005#,#6/25/2005#,"" .AddBar .AddItem("Task 2"),"Task",#6/28/2005#,#7/2/2005#,"" End With .EndUpdate End With |
1107 |
We want to have a Task ID column as the first column that shows the row number. How can we do that
' FormatColumn event - Fired when a cell requires to format its caption. Private Sub G2antt1_FormatColumn(ByVal Item As Long,ByVal ColIndex As Long,Value As Variant) With G2antt1 Value = .Items.ItemPosition(Item) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Columns.Add("Pos") .Width = 24 .AllowSizing = False .Position = 0 .FireFormatColumn = True End With With .Items .AddItem "Task A" .AddItem "Task B" .AddItem "Task C" .AddItem "Task D" End With .EndUpdate End With |
1106 |
How can I get the caption of focused item
' SelectionChanged event - Fired after a new item has been selected. Private Sub G2antt1_SelectionChanged() With G2antt1 With .Items Debug.Print( "Handle" ) Debug.Print( .FocusItem ) Debug.Print( "Caption" ) Debug.Print( .CellCaption(.FocusItem,0) ) End With End With End Sub With G2antt1 .BeginUpdate .LinesAtRoot = -1 .Columns.Add "Items" With .Items h = .AddItem("R1") .InsertItem h,,"Cell 1.1" .InsertItem h,,"Cell 1.2" .ExpandItem(h) = True h = .AddItem("R2") .InsertItem h,,"Cell 2.1" .InsertItem h,,"Cell 2.2" .ExpandItem(h) = True End With .EndUpdate End With |
1105 |
How can I get the caption of selected item
' SelectionChanged event - Fired after a new item has been selected. Private Sub G2antt1_SelectionChanged() With G2antt1 With .Items Debug.Print( "Handle" ) Debug.Print( .SelectedItem(0) ) Debug.Print( "Caption" ) Debug.Print( .CellCaption(.SelectedItem(0),0) ) End With End With End Sub With G2antt1 .BeginUpdate .LinesAtRoot = -1 .Columns.Add "Items" With .Items h = .AddItem("R1") .InsertItem h,,"Cell 1.1" .InsertItem h,,"Cell 1.2" .ExpandItem(h) = True h = .AddItem("R2") .InsertItem h,,"Cell 2.1" .InsertItem h,,"Cell 2.2" .ExpandItem(h) = True End With .EndUpdate End With |
1104 |
How can I get the link from the point
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.LinkFromPoint(-1,-1) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/29/2000# .PaneWidth(False) = 64 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/5/2001#,#1/7/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" .Link("L1",12) = "L1" h3 = .AddItem("Task 3") .AddBar h3,"Task",#1/8/2001#,#1/10/2001#,"K3" .AddLink "L2",h2,"K2",h3,"K3" .Link("L2",12) = "L2" End With .EndUpdate End With |
1103 |
How can I get the bar from the point
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.BarFromPoint(-1,-1) ) End With End Sub With G2antt1 .BeginUpdate .Columns.Add "Task" With .Chart .FirstVisibleDate = #12/29/2000# .PaneWidth(False) = 64 .LevelCount = 2 End With With .Items h1 = .AddItem("Task 1") .AddBar h1,"Task",#1/2/2001#,#1/4/2001#,"K1" h2 = .AddItem("Task 2") .AddBar h2,"Task",#1/4/2001#,#1/6/2001#,"K2" .AddLink "L1",h1,"K1",h2,"K2" h3 = .AddItem("Task 3") .AddBar h3,"Task",#1/8/2001#,#1/10/2001#,"K3" .AddLink "L2",h2,"K2",h3,"K3" End With .EndUpdate End With |
1102 |
How can I get the level from the cursor
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.LevelFromPoint(-1,-1) ) End With End Sub With G2antt1 With .Chart .FirstVisibleDate = #6/25/2010# .PaneWidth(False) = 0 .LevelCount = 4 End With End With |
1101 |
How can I get the date from the cursor
' MouseMove event - Occurs when the user moves the mouse. Private Sub G2antt1_MouseMove(ByVal Button As Integer,ByVal Shift As Integer,ByVal X As Long,ByVal Y As Long) With G2antt1 Debug.Print( .Chart.DateFromPoint(-1,-1) ) End With End Sub With G2antt1 With .Chart .PaneWidth(False) = 0 .LevelCount = 2 End With End With |